21
Hit 200 installed panels last week and it changed how I prep jobs now
Was always the type to just show up with a general plan and figure stuff out on the fly. But after install #200, I realized I was wasting like 30 mins per job hunting down parts or redoing wire runs. That number made me sit down and actually build a checklist and pre-stage all my gear the night before. Cut my average install time by 45 mins easy. Anyone else have a milestone that forced them to change their workflow?
2 comments
Log in to join the discussion
Log In2 Comments
patkelly1mo ago
200 panels? Man, that's a ton of work. I would have been burned out way before that number hit.
7
jennifer_murphy531mo ago
Honestly, my buddy hit 150 and then his kid was born, total game changer for his workflow.
5