Realized I was measuring every basement slab in Calgary wrong for 2 years
Honestly I was adding 3/8 inch to all my form heights out of habit from a job in Red Deer, and it finally bit me on a garage pad in Airdrie last week when the concrete sat a hair low at the door. A guy on my crew asked why I kept doing it and I didn't have a real answer. Been framing for 9 years and nobody ever called it out before. Any of you have a bad habit like that you picked up early and never dropped?