28
Switched from a 3-strand to a 2-strand rigging system after a close call in Tacoma
I used to always set up a 3-strand system for big limb removals, thinking more lines meant more control. After a 1.5-inch line snapped under load last fall, I switched to a simpler 2-strand setup with a redirect, which actually gives me better force management and less hardware to fail. Anyone else make a similar change after a rigging scare?
2 comments
Log in to join the discussion
Log In2 Comments
aaronlee26d ago
Switched to a 2-line system years ago for the same reason. Less gear to worry about, easier to manage the forces. You can still get a solid redirect if you need it.
4