I finally finished that curved wall I started last July

Had a retaining wall project out near where the old drive-in used to be just south of town. The curve radius was something like 12 feet and I thought I'd knock it out in a week. Took me almost 3 months because the soil kept shifting every time I got more than 4 feet high. Anyone else run into ground movement that just messes up your layout?
2 comments

Log in to join the discussion

Log In
2 Comments
emmam32
emmam326d ago
That 12 foot radius sounds like a real headache with the soil issues. I mean, maybe the ground just needed more time to settle before you packed it that high. Could be you were fighting against drainage that was trapping water behind the wall.
6
park.tara
park.tara6d ago
Graded the ground with a slight slope away and that fixed the drainage problem for me @emmam32.
10