Saw a crew in Nashville laying brick with a level and a story pole, no string line at all
I was in Nashville last month for a wedding and walked past a house going up on 8th Ave. Two guys were working the front wall with just a story pole and a 4 foot level, checking every course as they went. I have run string on every wall for 20 plus years, so I am wondering if anyone here has gone that route on a long straight run.