Am I the only one who thinks saw cut timing matters more than the mix
Had a slab in Grand Rapids last month that cracked right down the middle even with fiber mesh in it, because the guy cutting joints waited till 9am on a 78 degree day. How close do you all cut behind the power trowel finish, because I'm starting to think mix design gets way too much blame for cracks.