10
How damp air ruined my concrete step project
Now I always wait for a dry spell before mixing.
3 comments
Log in to join the discussion
Log In3 Comments
oliviaellis3d ago
So if damp air ruins the cure, your plastic cover could just be hosting a moisture party.
8
the_jamie3d ago
Good call on waiting for dry weather to mix. However, damp air can wreck the cure just as much as the mix. Concrete needs to lose water slowly as it hardens. High humidity stops this from happening right, leading to weak spots. You should cover the fresh concrete with plastic or use a curing compound. It's not just about when you mix, but how you protect it after.
7