Twin-screw vs cutterhead on clay, my 60 day comparison down on the Yazoo
I spent two months last fall running both setups on the same stretch of the Yazoo River, clearing out about 14,000 cubic yards of blue clay. The cutterhead would clog every time we hit a root ball, and we lost a whole day just digging it out. The twin-screw chewed through the same material without a single stall, and our fuel burn dropped by almost 30 percent. Has anyone else made that switch and seen a similar jump in production?
Cant believe you burned a whole day digging out a clogged cutterhead, that sounds like a nightmare on a job that size. Roots are the worst because they jam everything up and you just stand there watching money float away. Cutting fuel by 30 percent on top of no stalls would've sold me too.