Why does nobody talk about how many boxes 800 sheets actually turns into
Counted 412 empty boxes on the truck at the end of the Riverside job and it hit me that I've been guessing at dumpster size wrong for 3 jobs straight. How do you all figure out dumpster space before the drywall shows up?
My dumpster math is basically a coin flip with extra steps, so you're already ahead of me. Last time I sized one off gut feel and ended up with a pile of boxes taller than the truck. Counting them out loud like you did is the move, even if the neighbors think you're losing it.